The Mekong Bridge At Pak Lai / Pak Lay

DavidFL

0
Staff member
Subscribed
Jan 16, 2003
14,428
5,260
113
70
Chiang Khong
www.thegtrider.com
First announced in 2010
New bridge over the Mekong at PakLay

Mentioned in GTR here
GT-Rider Mekong Cruise Part III

299681=19321-GTR-Mekong-Part3_11.jpg


299681=19322-GTR-Mekong-Part3_12.jpg


& here in March 2015
gtr-img_6792-jpg.jpg



A news update October 2016
Paklai bridge to Be Earthquake Resistant

Paklai Bridge to Be Earthquake Resistant

Construction workers on Nasak-Khokkhaodor Bridge being built across the Mekong River to link the provinces of Xayaboury and Vientiane took many months to complete the underwater pylons supporting the bridge.
Project management has confirmed that those pylons have been built to the required engineering standards and will be earthquake proof.
Workers on the Nasak-Khokkhaodor Bridge or Paklaibridge crossing the Mekong River also took many months to build the bridge approaches on each side of the steel truss bridge.
The project manager in charge of construction, Mr. Bouavieng Champaphan, told Vientiane Times on Tuesday that the structure of the main bridge has now linked the two sides of the river after 20 months of delays.
The Paklaibridge has been erected in a quite deep section of the Mekong valley, so it was necessary to build 64 pylons under the water to support the bridge structure and make it earthquake proof.
The cost of construction of the pylons under the ground and the road approach to the bridge was about 129 billion kip.
The bridge itself is made of steel but in December a concrete road surface will be added to the deck.
Mr. Bouavieng added that motorists will be able to use the bridge across the river after the concrete has been paved for 28 days because that’s a standard to ensure concrete strength.
The bridge will be able to carry trucks weighing up to 80 tonnes, however, Lao law prohibits a truck weighing such an amount to travel on associated roads and bridges linking to the bridge.
The total cost of bridge construction is about 189 billion kip, with the Netherlands government providing grant aid totaling some 2.3 million euros (over 20 billion kip) towards the construction of the bridge.
The remainder of the funds came from the Lao government.
Previously, some local residents watching the bridge being built across the Mekong River to link the provinces of Xayaboury and Vientiane questioned what kind of loads it would be able to carry.
A number of residents commented that there are only four bridge pylons visible to them, which might be different to other bridges they have crossed, but project managers would like to stress that maybe those people don’t understand steel truss bridge construction.
The bridge is being built to recognised standards but maybe some citizens lack knowledge of the load bearing characteristics of steel truss bridges.
People see four bridge pylons but under the water and inside the ground there are 64 pylons supporting the bridge structure
At 365 metres, this will be the longest metal bridge in Laos. The Thangon Bridge that crosses the Nam Ngum River in Vientiane is the second longest metal bridge.
If well maintained, the Nasak-Khokkhaodor Bridge should last for 100 years.
It connects Nasak village in Paklai district, Xayaboury province, to Khokkhaodor village in Xanakham district, Vientiane province, and is the third bridge linking Xayaboury with neighbouring provinces.
The other two are the bridge spanning the Mekong River between Thadeua village in Xayaboury province and Pakkhone village in LuangPrabang province, while the third crosses the Mekong at Pakbaeng, linking Xayaboury and Oudomxay provinces.
The Nasak-Khokkhaodor Bridge will ease tourist travel from Loei province in Thailand to Vientiane via Road No. 4 in Xayaboury province and Road No. 11 on the left side of the Mekong River.
Vientiane is 204km from the Nasak-Khokkhaodor Bridge, which is reached via Road No. 11.

 

DavidFL

0
Staff member
Subscribed
Jan 16, 2003
14,428
5,260
113
70
Chiang Khong
www.thegtrider.com
Paklai Bridge to Open in April 2017

(KPL) The Paklai Bridge, spanning the Mekong as the longest steel truss bridge in the country (365 m), will be open for public use by the celebration of the Lao New Year in April, according to relevant officials.
The total cost of the bridge construction is about 189 billion kip (about US$23.1 million) with the Netherlands’ government providing grant aid totaling 2.3 million Euros (over 20 billion kip) towards the construction.
The bridge will be able to support 80-tonne trucks; however, Lao law prohibits trucks weighing such an amount to travel on associated roads and bridges.
The bridge itself is made of steel but in December a concrete road surface will be added to the deck.
The Thangon Bridge that crosses the Nam Ngum in Vientiane is the second longest steel bridge.
If well maintained, the Paklai Bridge should last up to 60 years.
The project manager in charge of construction, Mr. Bouavieng Champaphan has said that the structure of the main bridge has now linked the two sides of the river after 20 months of delays.
It connects Nasak village in Paklai, Xayaboury Province, to Khokkhaodor village in Xanakham, Vientiane Province, and is the third bridge linking Xayaboury with neighbouring provinces.
The other two are the bridge spanning the Mekong River between Thadeua village in Xayaboury Province and Pakkhone village in Luang Prabang Province, and a third that crosses the Mekong at Pakbaeng, linking the provinces of Xayaboury and Oudomxay.
The Paklai Bridge will ease travel from Loei Province of Thailand to Vientiane via Road No. 4 in Xayaboury Province and Road No. 11.
Vientiane is 204 km from the Paklai Bridge, which can be reached via Road No. 11.​

Source: KPL Lao News Agency. 18 January 2017.
 

DavidFL

0
Staff member
Subscribed
Jan 16, 2003
14,428
5,260
113
70
Chiang Khong
www.thegtrider.com
Finally open.

12 September 2017


New Mekong bridge opens, linking Xayaboury and Vientiane provinces - The Nation

New Mekong bridge opens, linking Xayaboury and Vientiane provinces

A newly built bridge crossing the Mekong River and connecting the provinces of Xayaboury and Vientiane has opened, and is the third bridge linking Xayaboury with neighbouring provinces.


The 365-metre bridge runs from Nasak village in Paklai district, Xayaboury province, to Khokkhaodor village in Xanakham district, Vientiane province.

Head of the Public Works and Transport Department in Xayaboury province, Phengxoy Phengmeuang, told Vientiane Times on Thursday “The project is fully complete and the bridge is open for use.”

“Motorists can cross the bridge and vehicles can pass along it unimpeded,” he said

An official handover ceremony will take place in October, the Director of the project told media recently.

The bridge is made of steel and is 8 metres wide with two traffic lanes.

The total cost of construction is about 189 billion kip, with the Netherlands government providing grant aid totalling 2.3 million Euros (over 20 billion kip) towards the project.

The government is funding the remainder of the construction cost.

This is the longest steel bridge in Laos, followed by the Thangon Bridge that crosses the Nam Ngum River in Vientiane.

Xayaboury is also linked to Luang Prabang province by a bridge that spans the Mekong between Thadeua village in Xayaboury and Pakkhone village in Luang Prabang. Another bridge crosses the Mekong at Pakbaeng, linking Xayaboury to Oudomxay.

This newest bridge will facilitate tourist travel from Loei province in Thailand to Vientiane via Road No. 4 in Xayaboury province and Road No. 11 on the left side of the Mekong.

Vientiane is 204km from the bridge, which is reached via Road No. 11.​